Fire safety systems and equipment

Engineered fire protection for demanding facilities

SAF TEAM LLC delivers design, supply, installation, testing and maintenance of fire safety systems for residential, educational, industrial, warehouse and commercial facilities.

01Design

risk review, system composition and project-based engineering decisions

02Installation

fire, electrical, water-based and ventilation system installation

03Handover and service

testing, documentation, instruction and scheduled maintenance

Core directions

5 systems, one controlled safety chain

The site structure follows the company presentation: each direction is separate, but on site they must operate as one coordinated scenario.

01

Primary firefighting equipment

02

Fire detection and alarm systems

03

Automatic fire suppression

04

Internal firefighting systems

05

Smoke extraction and ventilation

About us

One partner for the full fire safety lifecycle

During its operations, SAF TEAM has completed fire safety system installation works in 128 multi-apartment residential buildings.

For schools built under state programs, SAF TEAM performs project-defined installation and related works across fire alarm and fire suppression, electrical systems, internal firefighting, smoke extraction and ventilation, as well as evacuation plan-schemes.

Services

Systems that must work together

Fire safety is not only equipment. It is engineering logic, correct installation, tested scenarios and responsible maintenance.

1

Primary firefighting equipment

Fire extinguishers and related equipment for the early, controllable stage of a fire. Selection depends on the facility characteristics.

  • dry powder
  • carbon dioxide
  • air-foam
2

Fire detection and alarm systems

Early detection, fire alarm notification and timely evacuation. The system can activate smoke extraction and internal firefighting subsystems.

  • smoke and heat detectors
  • control panels
  • scenario links
3

Automatic fire suppression

Sprinkler and other automatic solutions to suppress or contain fire sources automatically.

  • sprinklers
  • pipework
  • hydraulic calculations
4

Internal firefighting systems

Fire cabinets, nozzles, hoses, valves, control nodes, working and reserve pumps.

  • flow sensors
  • pump nodes
  • water reserve tanks
5

Smoke extraction and ventilation

Metal ducts, backdraft dampers and fans to remove smoke on time and keep evacuation routes passable.

  • smoke scenarios
  • ventilation shutdown
  • fire alarm integration

Experience and sectors

Facilities where reliability is a requirement

Educational institutions

Universities, schools and educational facilities built under public programs.

Preschool institutions

Kindergartens and facilities with strict child evacuation requirements.

Residential buildings

Fire safety system installation works completed in 128 residential buildings.

Large shopping centers

High-occupancy spaces, car parks, evacuation zones and integrated scenarios.

Production and warehouse spaces

Industrial risks, high storage, pump systems and ductwork.

Public and private facilities

The company also actively participates in Armenian state procurement tenders.

Standards approach

Correct terms, correct responsibility

Each facility’s requirements are determined during design based on applicable legal acts, construction norms, project documentation and competent authority requirements.

  • fire protection systems
  • automatic fire suppression and fire alarm installations
  • fire safety rules
  • evacuation route plans

Our partners

Experience with recognizable institutions and businesses

Yerevan State UniversityKomitas Park LifeArmconstructSoft AMSML MiningTeam Telecom ArmeniaNor TunArcada ConstructionYerevan FairGriboedov ParkYerevan MallDomusUnibankDalma Garden Mall

Contact us

Send the facility brief, and we will define the next steps

Share the facility type, area, project stage and required systems. SAF TEAM will help clarify the scope of design and installation works.

+374 98 002003 info@safteam.am 2 Arshakunyats Ave, room 510, Yerevan Download PDF presentation